bob体育国内

<sub id="1fhfh"></sub>

    <sub id="1fhfh"></sub>
    
    
    <address id="1fhfh"></address>

      <sub id="1fhfh"></sub>

      <sub id="1fhfh"></sub>

      <sub id="1fhfh"></sub><sub id="1fhfh"></sub>

      <sub id="1fhfh"></sub>

        <sub id="1fhfh"></sub><sub id="1fhfh"></sub>

            E-Mail
            Sitemap
            Social Media
            Home > Notifications
            Notice on Temporary Road Shutdown on the Westside of No. 14 Building

            May 4, 2018  |  BROWSE TIMES:  |  LOCATION:

            Due to fact that the renovation of outer wall of the westside of the no. 14 residential building (Chang'an Campus) may involve clean-up of ceramic bricks, to ensure the safety of pedestrians and vehicles, the westside road of no. 14 building will be temporarily closed from May 5 to 15, 2018. Please make detour from the eastside of the building. Sorry for any inconvenience caused by the construction.


            Department of Construction and Logistics

            <sub id="1fhfh"></sub>

              <sub id="1fhfh"></sub>
              
              
              <address id="1fhfh"></address>

                <sub id="1fhfh"></sub>

                <sub id="1fhfh"></sub>

                <sub id="1fhfh"></sub><sub id="1fhfh"></sub>

                <sub id="1fhfh"></sub>

                  <sub id="1fhfh"></sub><sub id="1fhfh"></sub>

                      澳门葡京娱乐赌场官网

                      黄金岛|官方

                      ca888亚洲城 官方网站

                      丽盈在线/登录彩

                      乐游官网

                      澳门mg游戏娱乐平台

                      3a的彩首页

                      90比分网

                      www德赢